Electrical templates
Electrical jobs need clear scope because code requirements, permits and panel capacity can change the price. Itemizing devices, circuits and labor makes it easy for the customer to approve upgrades one at a time.
What to include
- Panel, circuit and device counts
- Wire gauge and breaker sizes for new circuits
- Permit and inspection fees
- Patching and painting exclusions, if drywall repair is not included
- License number, which many states require on electrical paperwork
Typical electrical line items
| Line item | Qty | Rate | Amount |
|---|---|---|---|
| 200A main panel upgrade | 1 ea | $2,100.00 | $2,100.00 |
| New 20A dedicated circuit | 3 ea | $285.00 | $855.00 |
| LED recessed lights, installed | 8 ea | $145.00 | $1,160.00 |
| GFCI outlets | 4 ea | $95.00 | $380.00 |
| Electrical permit | 1 ea | $175.00 | $175.00 |
Frequently asked questions
Do electricians need to show a license number on invoices?
Many states require the contractor license number on estimates, contracts and advertising. Add it in the business section so it prints on every document.
How do I write an electrical bid?
List each circuit and device, the panel work, fixtures (supplied by you or the customer), permits and exclusions. For commercial bids, follow the plans and reference the drawing sheet numbers.