Home / Trades / Flooring

How to price and write flooring estimates and invoices

Flooring is priced per square foot, plus removal, subfloor prep and trim. Including a waste factor and transitions keeps the estimate close to the final invoice.

How are flooring jobs usually priced?

Flooring is priced per square foot installed, with a waste factor added to the measured area — more for diagonal or patterned layouts. Removal of the old floor, subfloor leveling, trim and transitions are usually separate lines.

Material and labor are often shown separately so the customer can compare products without re-quoting the install.

If you price from drawings, measure room areas and baseboard lengths on the PDF first with the free PDF takeoff tool; the totals drop straight into an estimate.

What should flooring estimates and invoices include?

  • Rooms and measured square footage, plus a waste factor
  • Product name, style and color
  • Removal of existing flooring and disposal
  • Subfloor preparation
  • Trim, transitions and furniture moving

What are typical flooring line items?

Sample prices for illustration only.

Line itemQtyRateAmount
Remove existing carpet and pad
650 sq ft × $0.75
650 sq ft$0.75$487.50
Subfloor leveling
1 job × $350.00
1 job$350.00$350.00
Luxury vinyl plank, installed
715 sq ft × $4.25
715 sq ft$4.25$3,038.75
Baseboard / quarter round
220 ft × $2.50
220 ft$2.50$550.00
Transitions
4 ea × $35.00
4 ea$35.00$140.00

Which flooring template should you use?

Flooring Estimate Template

An estimate is a written, approximate price for a job, given before the work starts.

Flooring Invoice Template

An invoice is a request for payment for work that has been done or goods that have been delivered.

Frequently asked questions

How much waste should I add to a flooring estimate?

Typically 5–10% for straight lay and 10–15% for diagonal or herringbone patterns.

Sources

  1. Renovation, Repair and Painting Program: Contractors — U.S. Environmental Protection Agency. Firms paid to do work that disturbs paint in homes and child-occupied facilities built before 1978 must be EPA-certified and follow lead-safe work practices.