| Description | Qty | Rate | Amount |
|---|---|---|---|
| Site preparation and demolition 1 job × $1,850.00 |
1 job | $1,850.00 | $1,850.00 |
| Framing labor 40 hr × $65.00 |
40 hr | $65.00 | $2,600.00 |
| Lumber and fasteners 1 lot × $2,400.00 |
1 lot | $2,400.00 | $2,400.00 |
| Electrical subcontractor 1 job × $1,600.00 |
1 job | $1,600.00 | $1,600.00 |
| Building permit and inspection fees no tax 1 ea × $450.00 |
1 ea | $450.00 | $450.00 |
| Debris removal and dumpster rental 1 ea × $525.00 |
1 ea | $525.00 | $525.00 |
Free Contractor Quote Template
General contractors juggle materials, subcontractors, permits and labor on every job. A clear document that separates each cost line keeps the client informed and protects your margin when the scope changes. The template below is pre-filled with sample contractor line items — replace the prices with your own and download a PDF.
Pricing from plans? Measure wall lengths, floor areas and fixture counts on the PDF with our free PDF takeoff tool, then send the quantities into an estimate. Works on Mac, nothing uploaded.
When should you use a contractor quote?
Use a contractor quote when the scope is clear enough to commit to a fixed price. The customer knows exactly what they will pay, so spell out what is included and how long the price stands.
What should a contractor quote include?
For contractor work
- A scope of work that names every phase, from demolition to final clean-up
- Separate lines for labor, materials and subcontractors so changes are easy to price
- Permit and inspection fees listed on their own, usually without tax
- A payment schedule: deposit, progress payments and final balance
- A change-order clause stating that extra work is billed separately
On every quote
- A fixed total and what it covers
- How long the quoted price is valid
- What happens if the customer changes the scope
What do contractor quote line items look like?
Sample prices for illustration only. Your rates depend on your market, materials and labor costs.
| Line item | Qty | Rate | Amount |
|---|---|---|---|
| Site preparation and demolition 1 job × $1,850.00 | 1 job | $1,850.00 | $1,850.00 |
| Framing labor 40 hr × $65.00 | 40 hr | $65.00 | $2,600.00 |
| Lumber and fasteners 1 lot × $2,400.00 | 1 lot | $2,400.00 | $2,400.00 |
| Electrical subcontractor 1 job × $1,600.00 | 1 job | $1,600.00 | $1,600.00 |
| Building permit and inspection fees 1 ea × $450.00 | 1 ea | $450.00 | $450.00 |
| Debris removal and dumpster rental 1 ea × $525.00 | 1 ea | $525.00 | $525.00 |

What mistakes should you avoid on a contractor quote?
- Rolling overhead and profit into labor rates, so a scope cut quietly removes your margin
- Leaving out permit, dumpster and inspection costs because they feel like admin, not work
- Pricing hidden conditions as if they won't happen instead of listing an allowance or unit price
- No written change-order process, so extra work gets argued about at the final invoice
Not sure how to price the work? Read how contractor jobs are usually priced.
How do you fill out this contractor quote template?
- Add your business details and logo
- Enter the customer details
- List the work with quantities and fixed prices
- Add tax, discount and deposit
- Set how long the quote is valid, then download or send it
What other contractor templates are there?
General questions about quotes are answered in our quote template guide.
Sources
- Renovation, Repair and Painting Program: Contractors — U.S. Environmental Protection Agency. Firms paid to do work that disturbs paint in homes and child-occupied facilities built before 1978 must be EPA-certified and follow lead-safe work practices.
- 15 U.S. Code § 7001 (ESIGN Act) — Legal Information Institute, Cornell Law School. Under federal law, a signature or contract can't be denied legal effect just because it is electronic.