| Description | Qty | Rate | Amount |
|---|---|---|---|
| Hang 1/2" drywall | 64 sheet | $22.00 | $1,408.00 |
| Tape and finish (level 4) | 2048 sq ft | $0.90 | $1,843.20 |
| Corner bead | 120 ft | $1.50 | $180.00 |
| Materials and mud | 1 lot | $380.00 | $380.00 |
Free Drywall Estimate Template
Drywall work is measured in sheets or square feet and broken into hanging, taping and finishing. Stating the finish level avoids arguments about how smooth the final walls should be. The template below is pre-filled with sample drywall line items — replace the prices with your own and download a PDF.
What to include in a drywall estimate
- Square footage or number of sheets
- Board thickness and type (moisture- or fire-resistant)
- Finish level (levels 0–5)
- Texture, if any
- Whether priming and painting are included
Sample drywall estimate line items
Sample prices for illustration only. Your rates depend on your market, materials and labor costs.
| Line item | Qty | Rate | Amount |
|---|---|---|---|
| Hang 1/2" drywall | 64 sheet | $22.00 | $1,408.00 |
| Tape and finish (level 4) | 2048 sq ft | $0.90 | $1,843.20 |
| Corner bead | 120 ft | $1.50 | $180.00 |
| Materials and mud | 1 lot | $380.00 | $380.00 |
How to fill out this template
- Add your business name, contact details and license number
- Enter the customer and the job site address
- List each task or material with quantity, unit and rate
- Set tax, any discount and the deposit you need to start
- Add a valid-until date and terms, then download the PDF or send it
Frequently asked questions
What drywall finish level should I put on an estimate?
Level 4 is common for walls that will be painted with flat or eggshell paint. Level 5 adds a skim coat for critical lighting or glossy paint and costs more, so state the level clearly.
Is an estimate legally binding?
Generally, no. An estimate is an approximation. It becomes part of a binding agreement when the customer signs and accepts it, and many contractors attach their contract terms at that point. Rules vary by state and country.
How long should an estimate be valid?
Thirty days is common. Use a shorter window when material prices are volatile.
Can I turn an estimate into an invoice?
Yes. With a free HardHat Quote account you can save the estimate, and on Pro you can convert an approved estimate into an invoice in one click.