| Description | Qty | Rate | Amount |
|---|---|---|---|
| Trip charge / minimum 1 ea × $75.00 |
1 ea | $75.00 | $75.00 |
| Mount TV and hide cables 1 ea × $165.00 |
1 ea | $165.00 | $165.00 |
| Replace interior door hardware 4 ea × $35.00 |
4 ea | $35.00 | $140.00 |
| Drywall patch and paint (small) 2 ea × $95.00 |
2 ea | $95.00 | $190.00 |
| Materials 1 lot × $60.00 |
1 lot | $60.00 | $60.00 |
Free Handyman Estimate Template
Handyman work is a list of small tasks, so a clear task-by-task breakdown builds trust. Many handymen combine a minimum trip charge with hourly or per-task pricing. The template below is pre-filled with sample handyman line items — replace the prices with your own and download a PDF.
When should you use a handyman estimate?
Send a handyman estimate after the site visit and before you order materials or book the crew. It gives the customer an approximate price they can approve, while leaving room to adjust if the job turns out different from what a handyman could see on the walkthrough.
What should a handyman estimate include?
For handyman work
- Each task on its own line
- Minimum charge or trip fee
- Hourly rate for open-ended work
- Materials, with receipts available on request
- What is outside your scope (licensed electrical or plumbing work)
On every estimate
- A valid-until date, because material and labor prices change
- The deposit you need before work starts
- A line for customer approval or signature
What do handyman estimate line items look like?
Sample prices for illustration only. Your rates depend on your market, materials and labor costs.
| Line item | Qty | Rate | Amount |
|---|---|---|---|
| Trip charge / minimum 1 ea × $75.00 | 1 ea | $75.00 | $75.00 |
| Mount TV and hide cables 1 ea × $165.00 | 1 ea | $165.00 | $165.00 |
| Replace interior door hardware 4 ea × $35.00 | 4 ea | $35.00 | $140.00 |
| Drywall patch and paint (small) 2 ea × $95.00 | 2 ea | $95.00 | $190.00 |
| Materials 1 lot × $60.00 | 1 lot | $60.00 | $60.00 |

What mistakes should you avoid on a handyman estimate?
- No minimum charge, so a 20-minute job costs more in drive time than it earns
- Combining several tasks into one line so the customer can't drop one
- Taking on licensed electrical or plumbing work without saying it is excluded
- Billing materials without receipts available on request
Not sure how to price the work? Read how handyman jobs are usually priced.
How do you fill out this handyman estimate template?
- Add your business name, contact details and license number
- Enter the customer and the job site address
- List each task or material with quantity, unit and rate
- Set tax, any discount and the deposit you need to start
- Add a valid-until date and terms, then download the PDF or send it
What other handyman templates are there?
General questions about estimates are answered in our estimate template guide.
Sources
- Renovation, Repair and Painting Program: Contractors — U.S. Environmental Protection Agency. Firms paid to do work that disturbs paint in homes and child-occupied facilities built before 1978 must be EPA-certified and follow lead-safe work practices.
- 15 U.S. Code § 7001 (ESIGN Act) — Legal Information Institute, Cornell Law School. Under federal law, a signature or contract can't be denied legal effect just because it is electronic.