Free Carpentry Estimate Template
Carpentry projects mix custom work and materials. Separating material costs from labor makes it easy to adjust for different wood species and finishes. The template below is pre-filled with sample carpentry line items — replace the prices with your own and download a PDF.
Pricing from plans? Measure trim, decking and framing lengths on the PDF with our free PDF takeoff tool, then send the quantities into an estimate. Works on Mac, nothing uploaded.
When should you use a carpentry estimate?
Send a carpentry estimate after the site visit and before you order materials or book the crew. It gives the customer an approximate price they can approve, while leaving room to adjust if the job turns out different from what a carpenter could see on the walkthrough.
What should a carpentry estimate include?
For carpentry work
- Dimensions and drawings reference
- Wood species and finish
- Labor hours or a fixed price
- Hardware and fasteners
- Installation and clean-up
On every estimate
- A valid-until date, because material and labor prices change
- The deposit you need before work starts
- A line for customer approval or signature
What do carpentry estimate line items look like?
Sample prices for illustration only. Your rates depend on your market, materials and labor costs.
| Line item | Qty | Rate | Amount |
|---|---|---|---|
| Custom built-in shelving 1 ea × $1,850.00 | 1 ea | $1,850.00 | $1,850.00 |
| Trim carpentry labor 16 hr × $70.00 | 16 hr | $70.00 | $1,120.00 |
| Hardwood and sheet goods 1 lot × $780.00 | 1 lot | $780.00 | $780.00 |
| Finishing (stain and clear coat) 1 ea × $350.00 | 1 ea | $350.00 | $350.00 |

What mistakes should you avoid on a carpentry estimate?
- Not specifying wood species and finish
- Leaving installation out of a custom piece price
- No deposit to cover materials
- Forgetting hardware and fasteners
Not sure how to price the work? Read how carpentry jobs are usually priced.
How do you fill out this carpentry estimate template?
- Add your business name, contact details and license number
- Enter the customer and the job site address
- List each task or material with quantity, unit and rate
- Set tax, any discount and the deposit you need to start
- Add a valid-until date and terms, then download the PDF or send it
What other carpentry templates are there?
Frequently asked questions
How do carpenters price custom work?
Estimate materials (with waste), shop time and installation hours, then add finishing. Many carpenters require a deposit to cover materials before they start.
General questions about estimates are answered in our estimate template guide.