| Description | Qty | Rate | Amount |
|---|---|---|---|
| Demolition and haul-away 1 job × $1,450.00 |
1 job | $1,450.00 | $1,450.00 |
| Cabinet allowance 1 ea × $8,500.00 |
1 ea | $8,500.00 | $8,500.00 |
| Countertops (quartz), installed 45 sq ft × $75.00 |
45 sq ft | $75.00 | $3,375.00 |
| Tile backsplash, installed 30 sq ft × $32.00 |
30 sq ft | $32.00 | $960.00 |
| Plumbing and electrical rough-in 1 job × $2,800.00 |
1 job | $2,800.00 | $2,800.00 |
| Project management 1 job × $1,200.00 |
1 job | $1,200.00 | $1,200.00 |
Free Remodeling Estimate Template
Kitchen and bath remodels involve many trades and finish selections. Using allowances for cabinets, tile and fixtures keeps the estimate accurate while the client is still choosing finishes. The template below is pre-filled with sample remodeling line items — replace the prices with your own and download a PDF.
Pricing from plans? Measure floor areas, wall lengths and cabinet runs on the PDF with our free PDF takeoff tool, then send the quantities into an estimate. Works on Mac, nothing uploaded.
When should you use a remodeling estimate?
Send a remodeling estimate after the site visit and before you order materials or book the crew. It gives the customer an approximate price they can approve, while leaving room to adjust if the job turns out different from what a remodeling contractor could see on the walkthrough.
What should a remodeling estimate include?
For remodeling work
- Room-by-room scope
- Allowances for finishes the client has not chosen yet
- Trades and subcontractors involved
- Timeline with key milestones
- Change-order process and payment schedule
On every estimate
- A valid-until date, because material and labor prices change
- The deposit you need before work starts
- A line for customer approval or signature
What do remodeling estimate line items look like?
Sample prices for illustration only. Your rates depend on your market, materials and labor costs.
| Line item | Qty | Rate | Amount |
|---|---|---|---|
| Demolition and haul-away 1 job × $1,450.00 | 1 job | $1,450.00 | $1,450.00 |
| Cabinet allowance 1 ea × $8,500.00 | 1 ea | $8,500.00 | $8,500.00 |
| Countertops (quartz), installed 45 sq ft × $75.00 | 45 sq ft | $75.00 | $3,375.00 |
| Tile backsplash, installed 30 sq ft × $32.00 | 30 sq ft | $32.00 | $960.00 |
| Plumbing and electrical rough-in 1 job × $2,800.00 | 1 job | $2,800.00 | $2,800.00 |
| Project management 1 job × $1,200.00 | 1 job | $1,200.00 | $1,200.00 |

What mistakes should you avoid on a remodeling estimate?
- Using allowances that are too low, so every selection becomes an upcharge
- Not listing which trades are included and which are by the owner
- No timeline or milestone payment schedule
- Pricing hidden-condition repairs as included when you can't see them yet
Not sure how to price the work? Read how remodeling jobs are usually priced.
How do you fill out this remodeling estimate template?
- Add your business name, contact details and license number
- Enter the customer and the job site address
- List each task or material with quantity, unit and rate
- Set tax, any discount and the deposit you need to start
- Add a valid-until date and terms, then download the PDF or send it
What other remodeling templates are there?
Frequently asked questions
What is an allowance in a remodeling estimate?
An allowance is a budget set aside for items the client will choose later, such as cabinets or tile. If they pick something more expensive, the difference is added by change order.
General questions about estimates are answered in our estimate template guide.
Sources
- Renovation, Repair and Painting Program: Contractors — U.S. Environmental Protection Agency. Firms paid to do work that disturbs paint in homes and child-occupied facilities built before 1978 must be EPA-certified and follow lead-safe work practices.
- 15 U.S. Code § 7001 (ESIGN Act) — Legal Information Institute, Cornell Law School. Under federal law, a signature or contract can't be denied legal effect just because it is electronic.