| Description | Qty | Rate | Amount |
|---|---|---|---|
| Excavation and grading | 1 job | $900.00 | $900.00 |
| Gravel base, compacted | 6 yd | $55.00 | $330.00 |
| Rebar / wire mesh | 600 sq ft | $0.80 | $480.00 |
| 4" concrete slab, poured and finished | 600 sq ft | $8.50 | $5,100.00 |
| Broom finish and control joints | 1 ea | $0.00 | $0.00 |
Free Concrete Estimate Template
Concrete jobs are priced by square foot and thickness, with extra for excavation, reinforcement and finish. Itemizing prep and pour shows the customer why thicker or decorative slabs cost more. The template below is pre-filled with sample concrete line items — replace the prices with your own and download a PDF.
What to include in a concrete estimate
- Square footage and slab thickness
- Excavation, base material and compaction
- Reinforcement: rebar, wire mesh or fiber
- Finish type (broom, stamped, exposed aggregate)
- Curing time and when the surface can be used
Sample concrete estimate line items
Sample prices for illustration only. Your rates depend on your market, materials and labor costs.
| Line item | Qty | Rate | Amount |
|---|---|---|---|
| Excavation and grading | 1 job | $900.00 | $900.00 |
| Gravel base, compacted | 6 yd | $55.00 | $330.00 |
| Rebar / wire mesh | 600 sq ft | $0.80 | $480.00 |
| 4" concrete slab, poured and finished | 600 sq ft | $8.50 | $5,100.00 |
| Broom finish and control joints | 1 ea | $0.00 | $0.00 |
How to fill out this template
- Add your business name, contact details and license number
- Enter the customer and the job site address
- List each task or material with quantity, unit and rate
- Set tax, any discount and the deposit you need to start
- Add a valid-until date and terms, then download the PDF or send it
More concrete templates
Frequently asked questions
How do I estimate a concrete slab?
Calculate the volume (length × width × thickness ÷ 27 for cubic yards), add 5–10% for waste, then add excavation, base, reinforcement, forming, finishing labor and any pump truck fees.
Is an estimate legally binding?
Generally, no. An estimate is an approximation. It becomes part of a binding agreement when the customer signs and accepts it, and many contractors attach their contract terms at that point. Rules vary by state and country.
How long should an estimate be valid?
Thirty days is common. Use a shorter window when material prices are volatile.
Can I turn an estimate into an invoice?
Yes. With a free HardHat Quote account you can save the estimate, and on Pro you can convert an approved estimate into an invoice in one click.